Skip to the manual

In depthFrom script to film

Assembling and delivering AI-made films: cuts, voice, music, captions and end card

Generating shots is half a film. The other half is ordering and cutting them, adding voice and music, captions and an end card, levelling the sound and delivering a verifiable file. In MYEQ.PRO assembly is one more step in the same flow, quoted before you pay and checked on delivery.

Topic: AI film assembly
On this page

Measured facts

  • Up to 160 clips and 10 minutes per assembly, with hard cuts, split screens of up to 4 panels, picture in picture and screens framed on a stage.
  • Films of 16.5 to 17.5 s: quoted at a 4-cent maximum, charged 1 cent, about 15 s of render.
  • Measured delivery sound: −14.5 LUFS with true peak between −1.8 and −2.0 dBFS.
  • A failure after the charge was refunded in full; repeating the confirmation with the same key did not charge twice.

Figures measured by MYEQ.PRO in its preproduction environment in November 2026, unless marked as a published price. They describe tested cases, not a guarantee for every shot.

01

From approved takes to a film

Assembly works from the project's own resources: takes that passed their check, voices, music and logos. A take that failed its check does not get in unless you explicitly accept it, so a faulty take cannot slip into the delivery by accident.

The resulting film is stored as a video in the project's Resources, and its SHA-256 matches the one on the receipt.

02

What goes into the assembly

An assembly plan describes the whole film:

  • Clips in order with in and out points.
  • Split screens with labels.
  • Composites of a cut-out subject over another background video or image.
  • Voice placed at its moment, and music under the voice that ducks when someone speaks.
  • Captions and lower thirds drawn as exact text.
  • An end card with the logo and a single loudness for the whole film.
03

Quote and confirmation

The first call charges nothing: it returns the completed plan, the timeline, a plan fingerprint and the maximum price. The second confirms with that fingerprint, the maximum and an idempotency key. If the plan has changed or the maximum is below the current quote, it is refused before any charge.

Assembly is charged on measured compute, below the maximum, and the difference is refunded.

04

Checking the delivered film

The quality check measures the film and returns data, not opinions. In the test it flagged abrupt changes at 6.04, 10.04 and 15.04 s, which were exactly the plan's three cuts; three black frames, which were the end card fading in; and a still image at the end, which was the end card itself.

The agent compares those flags with what it expected. An abrupt change inside a single generated shot, a frozen stretch in the middle of a move or a face drifting from its START photo are reasons to retake.

05

What assembly does not do yet

Assembly uses hard cuts. There are no dissolves, speed changes, picture-in-picture or animated titles. If you need them, the film can be finished in your own editor from the delivery.

The saved editor timeline can also be exported, with cuts, trims and audio, but without captions or an end card.

Frequently asked questions

How much does it cost to assemble a film?

It is quoted up front with a maximum and charged on measured compute. In testing, films of about 17 s were quoted at 4 cents and charged 1.

What if the assembly render fails?

The charge is refunded in full. In the test, a logo registered with a file that was not an image made the render fail and the 3 cents were refunded.

Can I assemble over MCP?

Yes: assembly is a tool with a quote and a confirmation, and its status can be polled until the film is ready.

What loudness does the delivery have?

A single one for the whole film. In testing, −14.5 LUFS with a true peak between −1.8 and −2.0 dBFS.

Let your agent produce the film.

Connect the MYEQ MCP, send a script and approve a priced shot plan before anything is generated.

See how the MCP works